Technology Upgrades Project – Athletics Fields – 03-15-19 Weekly Construction Update
Work this week: The electrical contractor pulled new data from new IDF rack location to all data drop and WAP locations in 9100 & 9200…
Work this week: The electrical contractor pulled new data from new IDF rack location to all data drop and WAP locations in 9100 & 9200…
Work this week: The electrical contractor completed painting all conduits on soffits and high walls in building 1400…
Work this week: The electrical contractor has installed a new IDF rack in building 7400/7500…
Work this week: The electrical contractor poured the base for the WIFI poles at the softball field and track…
Work this week: The electrical contractor finished installing Wireless Access Point (WAP’s) soffits in building 1400…
Monthly status update on all existing Measure L projects.
Work this week: The electrical contractor completed the install of overhead conduit and pull-boxes on soffits and high walls in building 1400…
Work this week: The electrical contractor trenched, installed underground conduit, and backfilled behind the backstop at the baseball field…
Work this week: The electrical contractor installed overhead conduit and pull boxes on soffits and high walls in building 1400…
Work this week: The electrical contractor trenched, installed underground conduit, and backfilled from building 9100 to building 9200…