Category: District Wide Upgrades

North County Campus IT Backup Generator – 06-18-21 Weekly Construction Updates

June 18, 2021 · District Wide Upgrades

Work this week: The contractor installed the emergency stop button on the MTS and the gas regulator.

Download PDF →

North County Campus IT Backup Generator – 05-28-21 Weekly Construction Updates

May 28, 2021 · District Wide Upgrades

Work this week: The wiring work for the manual and automatic transfer switches has been completed. Generator was received and set it in place.

Download PDF →

North County Campus IT Backup Generator – 05-21-21 Weekly Construction Updates

May 21, 2021 · District Wide Upgrades

Work this week: The contractor set the automatic transfer switch, and the manual transfer switch, and began pulling wiring through the previously installed conduits.

Download PDF →

April 2021 Monthly Project Update

April 1, 2021 · District Wide Asphalt, District Wide Upgrades, North County Sitework, SLO HVAC/Roofs Phase 1

Monthly status update on all existing Measure L projects.

Download PDF →

North County Campus IT Backup Generator – 03-19-21 Weekly Construction Updates

March 19, 2021 · District Wide Upgrades, North County Sitework

Work this week: Conduit boxes were placed and conduit was ran above ceiling from the electrical room to the server room. The contractor began work on the gas feed for the generator.

Download PDF →

NCC IT Backup Generator – 03-12-21 Weekly Update

March 12, 2021 · District Wide Upgrades, North County Sitework

Work this week: Contractor completed conduit runs. Concrete was replaced at the walkway and poured at the generator pad in the chiller yard.

Download PDF →

District-Wide Upgrades – Primary Electrical – 01-10-20 Weekly Construction Update

January 10, 2020 · Construction Updates, District Wide Upgrades

Work this week: General contractor installed all new electrical primary gear...

Download PDF →

September 2019 Monthly Project Update

October 1, 2019 · Construction Updates, District Wide Upgrades, NCC Early Childhood Education Center, SLO 1000 Complex Renovations, SLO 2000 Complex Renovations, SLO Data Center, Technology Upgrades 2nd

Monthly status update on all existing Measure L projects.

Download PDF →

August 2019 Monthly Project Update

September 1, 2019 · Construction Updates, District Wide Upgrades, NCC Early Childhood Education Center, SLO 1000 Complex Renovations, SLO 2000 Complex Renovations, SLO Data Center, Technology Upgrades 2nd

Monthly status update on all existing Measure L projects.

Download PDF →

District-Wide Upgrades – Primary Electrical – 08-30-19 Weekly Construction Update

August 30, 2019 · Construction Updates, District Wide Upgrades

Work This Week: The contractor completed the campus wide shut down allowing them to do the coring needed to get their conduits into the vaults...

Download PDF →
Older Posts →
  • Search News:

    Search the Cuesta College Bond Website:
  • News Categories

    • Articles
    • Construction Updates
      • 9100 Roofing-HVAC
      • District Wide Asphalt
      • District Wide Upgrades
      • District Wide Upgrades 2nd
      • District-Wide Wayfinding
      • EV Charging Stations
      • Hollister Adobe Stabilization
      • Interim Housing
      • NCC Early Childhood Education Center
      • NCC Parking Lot 10 and Monument Sign
      • North County Campus Center
      • North County Sitework
      • Planning – Aquatic Center
      • Repairs – HVAC/Roofs 1100, 4500, and 4600
      • SLO 1000 Complex Renovations
      • SLO 2000 Complex Renovations
      • SLO Campus Instructional Building
      • SLO Data Center
      • SLO HVAC/Roofs Phase 1
      • SLO HVAC/Roofs Phase 2
      • SLO Switchgear Replacement
      • Technology Upgrades 2nd
      • Technology Upgrades 3rd
      • Upgrades – Aquatic Center
    • Press Releases
    • Uncategorized