9100 Roofing and HVAC – 04-01-22 Weekly Construction Update
Work this week: HVAC equipment installation work remains ongoing. Downspout installation work is in progress.
Download PDF →Restroom/Drinking Fountain ADA Upgrades – 04-01-22 Weekly Construction Update
Work this week: Contractor mobilized and began demolition in Buildings 4000, 1400 and 7100. MEP rough in work began in Building 4000 and 1400.
Download PDF →April 2022 Monthly Project Update – 9100 2nd Issuance
Monthly status update on 2nd Issuance Building 9100 Measure L projects.
Download PDF →9100 Roofing and HVAC – 03-25-22 Weekly Construction Update
Work this week: The contractor completed the roofing portion of work. The HVAC equipment installation remains ongoing.
Download PDF →9100 Roofing and HVAC – 03-18-22 Weekly Construction Update
Work this week: The roofing installation work is ongoing. New parapet wall framing, and substrate were installed. The gutter and downspout installation began.
Download PDF →9100 Roofing and HVAC – 03-11-22 Weekly Construction Update
Work this week: The roofer contractor began installing the new roofing system. New roof hatch was installed.
Download PDF →March 2022 Monthly Project Update
Monthly status update on all existing Measure L projects.
Download PDF →February 2022 Monthly Project Update
Monthly status update on all existing Measure L projects.
Download PDF →SLO 6100, 6300, and 7100 Roofing and HVAC – 01-07-21 Weekly Construction Update
Work this week: Refrigerant lines for the new condenser units on the main roof of Building 6300 were installed and tested. The fan coil unit in 6307 was removed, and the existing trellis roofing was replaced.
Download PDF →January 2022 Monthly Project Update
Monthly status update on all existing Measure L projects.
Download PDF →