SLO Instructional Building – 04-14-17 Weekly Construction Update
Work this week: The electrical contractor has installed and connected the switchgear in the building…
Work this week: The electrical contractor has installed and connected the switchgear in the building…
Work this week: Framing of the second floor interior walls has continued…
Monthly status update on all existing Measure L projects.
Work this week: The electricians began the wall rough-in on the second floor and installing their equipment racks on the roof…
Work this week: The metal framing contractor was installing backing in areas previously identified…
Work this week: The interior stairwell walls were framed…
Work this week: The roofing contractor began to install the single ply roofing, the second floor restrooms walls have started to be framed, and the exterior stair was installed on the east side of the building…
Work this week: The fire sprinkler rough-in was completed on the first floor…
Visit either the San Luis Obispo or North County campuses and you will notice some major changes underway. Both campuses are simultaneously erecting new buildings by way of Measure L funding. The San Luis Obispo Campus is constructing a 32,000 square foot, two-story instructional building, that will include eight high capacity multi-discipline classrooms capable of […]
Monthly status update on all existing Measure L projects.