SLO Electrical Building Switchgear Replacement – 11-18-22 Weekly Construction Update
November 18, 2022 · SLO Switchgear Replacement
Work this week: Contractor began erecting block walls and installed double door frame. Trenches were backfilled at walkways and asphalt paving work has been completed.