Rework on Fire Alarms in Buildings 4100, 4200, 4300
Location: San Luis Obispo
Date(s) in Effect: 2/27/23, 7am-4pm
Description: Contractor will be on site to perform rework on fire alarms in Buildings 4100, 4200 and 4300. Please be advised no audible/visuals will be sounded at this time. Area of work is noted on the associated map.
8100 Modular Building Removal
Location: San Luis Obispo
Date(s) in Effect: 2/20/23 – 3/2/23, 7am-4pm
Description: The contractor will be onsite to separate and haul away the 8100 modular building. The area of work is identified on the map below. Although Parking Lot 4 will remain open, the contractor will be utilizing portions of the lot for staging and access purposes. Noise is to be expected.
Fire Alarm Pre-Testing in Buildings 4100, 4200,4300, and 5400
Location: San Luis Obispo
Date(s) in Effect: 2/17/23 & 2/20/23, 7am-4pm
Description: On February 17, 2023 the contractor will perform fire alarm pre-testing in Buildings 4100, 4200, and 4300. The contractor will return on February 20, 2023 to install and pre-test fire alarm devices in Building 5400. Please be advised alarm will be audible and visible strobes will be set off at these locations during this time of work. Area of work is noted on associated map.
HVAC Rooftop Work at Building 4000
Location: San Luis Obsipo
Date(s) in Effect: 12/27/22 - 12/28/22
Description: Contractor will install powered exhaust units at the rooftop of Building 4000. This work will require interior access in multiple areas of the Building. Please be advised heating & AC will be interrupted for the duration of this work. Area of work is noted on the associated map. Noise is to be expected.
Demo Work at Building 6200 Restrooms
Location: San Luis Obsipo
Date(s) in Effect: 12/27/22 – 2/17/23
Description: Contractor will begin demolition and reconstruction work in both the men’s & women’s restrooms at Building 6200. Work will take place throughout the day & evenings. Please be advised restrooms will be closed for the duration of this work. Area of work is noted on the associated map. Noise is to be expected.
Electrical Work at 6000 Complex & All 6000 Modular Buildings
Location: San Luis Obsipo
Date(s) in Effect: 12/27/22 - 12/28/22, 7am-4pm
Description: Contractor will be performing electrical work at the 6000 complex & all 6000 modular buildings. Please be advised power will be down for the duration of work. Area of impact is noted on the associated map.
Fire Alarm Work at Building 6600A
Location: San Luis Obsipo
Date(s) in Effect: 12/15/22 & 12/16/22, 9am-2pm
Description: Contractors will require access to Building 6600A to perform work associated with the fire alarm. Please be advised alarm will be visible and audible intermittently during this time of work. Area of work is noted on the associated map.
Light Fixtures and Ceiling Tile Removal in Room 6304
Location: San Luis Obsipo
Date(s) in Effect: 12/19/22 – 1/13/23, 7am-4pm
Description: Contractor will access room 6304 to remove & replace existing electrical light fixtures and acoustical ceiling tile. Area of impact is noted on the associated map. Noise is to be expected.
Crane Work at Building 7100
Location: San Luis Obsipo
Date(s) in Effect: 12/19/22 – 12/22/22, 7am-4pm
Description: A crane will be utilized to remove and install new HVAC units at the rooftop of Building 7100. Please be advised heating & AC will be down in Building 7100 for the duration of this work. The laydown yard for crane and truck stage for loading/unloading is noted on the associated map. Adjacent lanes will be closed to pedestrians and traffic. Noise is to be expected.
Fire Alarm Test at Building 4100
Location: San Luis Obsipo
Date(s) in Effect: 12/19/22, 10am-12pm
Description: Contractor will be testing the fire alarm in Building 4100. Area of work is noted on the associated map. Please be advised alarm will be visible and audible intermittently during this time of work.