Fire Alarm Pre-Testing in Buildings 4100, 4200,4300, and 5400

Location: San Luis Obispo

Date(s) in Effect: 2/17/23 & 2/20/23, 7am-4pm

Description: On February 17, 2023 the contractor will perform fire alarm pre-testing in Buildings 4100, 4200, and 4300. The contractor will return on February 20, 2023 to install and pre-test fire alarm devices in Building 5400. Please be advised alarm will be audible and visible strobes will be set off at these locations during this time of work. Area of work is noted on associated map.



HVAC Rooftop Work at Building 4000

Location: San Luis Obsipo

Date(s) in Effect: 12/27/22 - 12/28/22

Description: Contractor will install powered exhaust units at the rooftop of Building 4000. This work will require interior access in multiple areas of the Building. Please be advised heating & AC will be interrupted for the duration of this work. Area of work is noted on the associated map. Noise is to be expected.



Demo Work at Building 6200 Restrooms

Location: San Luis Obsipo

Date(s) in Effect: 12/27/22 – 2/17/23

Description: Contractor will begin demolition and reconstruction work in both the men’s & women’s restrooms at Building 6200. Work will take place throughout the day & evenings. Please be advised restrooms will be closed for the duration of this work. Area of work is noted on the associated map. Noise is to be expected.



Electrical Work at 6000 Complex & All 6000 Modular Buildings

Location: San Luis Obsipo

Date(s) in Effect: 12/27/22 - 12/28/22, 7am-4pm

Description: Contractor will be performing electrical work at the 6000 complex & all 6000 modular buildings. Please be advised power will be down for the duration of work. Area of impact is noted on the associated map.



Fire Alarm Work at Building 6600A

Location: San Luis Obsipo

Date(s) in Effect: 12/15/22 & 12/16/22, 9am-2pm

Description: Contractors will require access to Building 6600A to perform work associated with the fire alarm. Please be advised alarm will be visible and audible intermittently during this time of work. Area of work is noted on the associated map.



Light Fixtures and Ceiling Tile Removal in Room 6304

Location: San Luis Obsipo

Date(s) in Effect: 12/19/22 – 1/13/23, 7am-4pm

Description: Contractor will access room 6304 to remove & replace existing electrical light fixtures and acoustical ceiling tile. Area of impact is noted on the associated map. Noise is to be expected.



Crane Work at Building 7100

Location: San Luis Obsipo

Date(s) in Effect: 12/19/22 – 12/22/22, 7am-4pm

Description: A crane will be utilized to remove and install new HVAC units at the rooftop of Building 7100. Please be advised heating & AC will be down in Building 7100 for the duration of this work. The laydown yard for crane and truck stage for loading/unloading is noted on the associated map. Adjacent lanes will be closed to pedestrians and traffic. Noise is to be expected.



Fire Alarm Test at Building 4100

Location: San Luis Obsipo

Date(s) in Effect: 12/19/22, 10am-12pm

Description: Contractor will be testing the fire alarm in Building 4100. Area of work is noted on the associated map. Please be advised alarm will be visible and audible intermittently during this time of work.



Power Outages at Buildings 4000, 4100, 4200, 4300, 4400, 4500, & 4600

Location: San Luis Obispo

Date(s) in Effect: 12/17/22, 8am-2pm

Description: The contractor will perform an electrical inspection to the switchgear equipment at the 4000’s complex. Please be advised power will be shut down at these locations for the entire duration of this work. Area of work is noted on the associated map. Noise is to be expected.



Phone Line Replacement Campus-Wide

Location: San Luis Obsipo

Date(s) in Effect: 12/12/22 – 1/13/23, 7AM – 4PM

Description: Contractor will be removing damaged analog phone lines and replacing them with new active lines. The majority of the work will be at telecom and elevator control rooms. Some noise is to be expected.