Construction Alerts Archive

 

HVAC Work At Buildings 5100, 5200, 5300 and 5400

Location: San Luis Obispo

Date(s) in Effect: 8/4/21, 7am-4pm

Description: Contractor will be performing HVAC baseline test & balance work on Buildings 5100, 5200, 5300, and 5400. Much of this work will take place on the rooftop of each building. Please be advised the contractor may access a few areas on the interior of the buildings in order to take air flow readings. Moderate noise levels may be heard at times.



Emergency Gas Shut-Off in Building N9800 – Chiller Yard

Location: North County Campus

Date(s) in Effect: 7/26/21, 5:30pm-10:00pm

Description: Contractor will be conducting an Emergency Gas Shut-Off to rework gas service valve and point of connection for IT Backup Generator. Please be advised gas service will be turned off in Building N9800 for the duration of impact.



Wired/Wireless Network Connectivity Off Campus Wide and Power off in Building N3100

Location: North County Campus

Date(s) in Effect: 7/17/21, 7am-4pm

Description: Contractor will be conducting a power switchover to the tie-in IT backup generator, as well as the automatic & manual transfer switches. Please be advised, power will be turned off in Building N3100 and all wired and wireless network connectivity will be down in all locations at the North County Campus for the entire duration. This includes access to services such as the internet, Banner, and myCuesta from the North County Campus. These services will remain accessible from the San Luis Obispo Campus.



Power Shutdown To Various Locations At SLO Campus

Location: San Luis Obispo

Date(s) in Effect: Friday, 6/25/21, 7am-7pm & Saturday, 6/26/21, 7am-7pm

Description: Failing electrical switchgear and high voltage runs on the SLO campus are being replaced. Multiple buildings on the SLO campus will be without power. All items requiring refrigeration must be relocated during the shutdown to avoid expiration. Please see below for the affected buildings.



Power Shutdown To Various Locations on SLO Campus

Location: San Luis Obispo

Date(s) in Effect: 6/19/21 - 7am-7pm

Description: Failing electrical switchgear and high voltage runs on the SLO campus are being replaced. Multiple buildings on the SLO campus will be without power. All items requiring refrigeration must be relocated during the shutdown to avoid expiration. Please see below for the affected buildings.



Rerouting Existing Electrical in Building 6300, Room 6304

Location: San Luis Obispo

Date(s) in Effect: 6/16/21, 7am–9am

Description: The general contractor will be rerouting an existing electrical circuit in Building 6300, Room 6304. Please be advised all building wired and wireless network access will be down for duration of impact. Area of work is noted on associated map. Noise is to be expected.



Asphalt Repairs To Parking Lot 10

Location: North County Campus

Date(s) in Effect: 6/14/21 – 8/13/21, 7am-4pm

Description: Contractor will begin phase 2 asphalt repairs to Parking Lot 10. Area of work is noted on the associated map. Please be advised main entrance off Buena Vista Blvd. will remain open. Accessible walkways/parking stalls, and bus loop area will not be impacted. Noise is to be expected.



North County Campus RTA Bus Stop Moves In Front of Campus Center

Location: North County Campus

Date(s) in Effect: 6/7/21 (onward)

Description: Starting June 7th, the North County Campus RTA Bus Stop will permanently move to the new location in front of the Campus Center, Building N1000/N1100. Location is identified on associated map.



Roof Work & Noise at Buildings 4100 & 6200

Location: San Luis Obispo

Date(s) in Effect: 5/24/21 – 5/26/21, 7am-3:30pm

Description: Contractors will be performing punch list work on the roofs of Buildings 4100 and 6200. Access to Buildings will not be impacted. Area of work is noted on associated map. Noise is to be expected.



Communication Conduit Work in Building 4200

Location: San Luis Obispo

Date(s) in Effect: 5/26/21 – 5/27/21, 7am–3:30pm

Description: The general contractor will be rerouting existing communications conduit in Building 4200. Please be advised network and wireless access in 4201 will be down for duration of impact. Area of work is noted on associated map. Moderate noise is to be expected.