Wired and Wireless Network Access Will Be Down Across Entire Campus

Location: San Luis Obispo

Date(s) in Effect: 4/9/21 – 4/10/21, 11:30pm-2:30am

Description: Please be advised all wired and wireless network access, including internet and Banner will be down for the duration of impact. The entire campus will be affected by this outage.



Soil Sample Drilling At Buildings 8000, 8100, 6200, 6600s & Education Drive

Location: San Luis Obispo

Date(s) in Effect: 4/5/21 – 4/9/21, 7am-5pm

Description: Contractor will be drilling for soil samples in multiple locations within the shaded area on associated map. Please be advised that the equipment location will move throughout the day and may require slight detours to pedestrian traffic. Moderate noise is to be expected.



Slurry Seal & Striping Parking Lot 12

Location: North County

Date(s) in Effect: 4/6/21 – 4/8/21, 7am-5pm

Description: Contractor will be applying slurry seal and striping in Parking Lot 12. Vehicle and pedestrian access to Parking Lot 12 will be closed for duration of impact. Area of work is highlighted on associated map. Please use Parking Lot 11 as alternative parking. Please be advised that moderate noise levels may be heard at times.



Electrical Work At Building 6200

Location: San Luis Obispo

Date(s) in Effect: 3/18/21, 7am-8am

Description: Contractors will be replacing a failing electrical breaker in Building 6200. Please be advised power to Building 6200 will be shut off for the duration of impact (approximately 1 hr.). Moderate noise is to be expected.



HVAC Work At Building 7100 Annex (Rm 7107)

Location: San Luis Obispo

Date(s) in Effect: 3/17/21 – 4/2/21, 7am-4pm

Description: Contractors will begin demoing existing HVAC equipment and installing new HVAC on Building 7100 Annex. Please be advised there will be no heating or cooling in Room 7107 for duration of impact. Please be advised that moderate noise levels may be heard at times.



Fiber Optic Cable Work In Bldgs. 5100 and 5400

Location: San Luis Obispo

Date(s) in Effect: 3/9/21 – 3/16/21, 7am-4:30pm

Description: The contractor will be pulling new fiber optic cable to Buildings 5100, and 5400. During this time, the new fiber will be terminated at the Data Center and old fiber removed. Please be advised that moderate noise levels may be heard at times.



Ceiling Conduit Work At LRC Electrical Room to Server Room

Location: North County Campus

Date(s) in Effect: 3/5/21 – 3/17/21, 7am-5pm

Description: Contractor will be core drilling the block walls above ceilings. Placement work of ceiling conduit running from Learning Resource Center Electrical Room to Server Room will be performed. Please be advised offices & classrooms impacted are as follows: N3121, N3127, N3129, N3129, N3130, N3133, N3134, N3135, and N3151. Moderate noise may be heard at times.



Tile & Concrete Work At Bldg. 5400/5100

Location: San Luis Obispo

Date(s) in Effect: 3/4/21 – 4/2/21, 7am-4pm

Description: Contractor will be removing tile and concrete and placing new concrete at the entrance to the 5400/5100 Buildings. Area of Impact is highlighted in the map below. Please be advised that intermittent noise is to be expected.



HVAC Air Flow Readings In Building 2500

Location: San Luis Obispo

Date(s) in Effect: 3/6/21, 8am-1pm

Description: Contractor will be performing pre-read testing on the HVAC equipment for Building 2500. This work will consist of accessing rooms and taking air flow readings at HVAC registers. Please be advised that moderate noise levels may be heard at times.



HVAC Work On Building 4100

Location: San Luis Obispo

Date(s) in Effect: 3/1/21 – 4/9/21, 7am-4pm

Description: Contractors will begin work on Building 4100. This work will consist of demoing existing HVAC equipment and installing new HVAC. The work will also include removal and reinstallation of electrical equipment. Please be advised there will be no power, heating or cooling in Building 4100 for duration of impact. Please be advised that moderate noise levels may be heard at times.