Construction Alerts Archive
Parking Lot 10 Closed For Striping
Location: North County Campus
Date(s) in Effect: 1/10/22, 7am-4pm
Description: Contractor will be striping in Parking Lot 10. Please be advised the area noted on the associated map will be blocked off and closed for duration of impact.
Reach Lift Work at Building 6300
Location: San Luis Obispo
Date(s) in Effect: 1/11/22, 7am-4pm
Description: A reach lift will be utilized to move material from the roof top at Building 6300. Please be advised the area between Building 6100 and 6300 as noted on the associated map will be inaccessible for the duration of impact. Noise is to be expected.
Network Disruption at Building N1000/N1100, IT Room
Location: North County Campus
Date(s) in Effect: 12/27/21 – 12/30/21, 7am-4pm
Description: Taft Electric will be onsite terminating fiber within the N1000/N1100 building. This will disrupt network access for the entire building for the duration of the work. Access will be restored promptly after the terminations are complete.
Light Pole Installation at Parking Lot 10
Location: North County Campus
Date(s) in Effect: 12/3/21, 7am-4pm
Description: Contractor will be installing light pole heads in Parking Lot 10. Please be advised a portion of Parking Lot 10 will be closed for duration of impact. Area of impact is noted on associated map.
Network Maintenance Inside NCC Data Center
Location: North County Campus
Date(s) in Effect: 11/20/21, 10am-3pm
Description: The Information Technology team will be performing maintenance on network equipment inside the Data Center. This work will prohibit network access for the entire campus for the duration of impact. Network access will be restored immediately after the work is complete.
Mechanical Punch List Work at Buildings 4100, 4300, 4400, 6200, 7100
Location: San Luis Obispo
Date(s) in Effect: 11/17/21, 7am-4pm
Description: Contractor will be performing mechanical punch list work. Area of work is highlighted in red below. No impacts are anticipated beyond minimal noise impacts related footsteps on the roof and use of handheld power tools. There will be no impact to airflow in offices and classrooms.
Data Fiber Work at Parking Lot 10, Quad, and Campus Center Data Room
Location: North County Campus
Date(s) in Effect: 10/25/21 – 10/26/21 7am-4pm
Description: Contractor will be pulling fiber from wireless access point locations to the Campus Center Data Room. Area of work is noted on the associated map. All paths of travel will remain accessible.
Roofing & HVAC Crane, Lift and Dumpster at Building 6300
Location: San Luis Obispo
Date(s) in Effect: 10/26/21 - 11/5/21, 2021, 7am-4pm
Description: A crane, lift, and dumpster will be utilized for the Roofing & HVAC replacement work being performed. The lawn area adjacent to Building 6300 will be blocked off. Area of impact is noted on the associated map. Please be advised noise is to be expected.
Replacement of Roofing & HVAC for Building 6300
Location: San Luis Obispo
Date(s) in Effect: 10/14/21 – 1/14/22, 7am-4pm
Description: Contractor will begin the demo and replacement of the roofing and HVAC for Building 6300. A temporary fencing area will be installed within Parking Lot 3 & 4 to store material & equipment. Areas of impact are highlighted in yellow on the associated map. Noise is to be expected.
Utility Locating & Investigation at Buildings 6200, 6300, 6600’s, 6700, 6800, 8000
Location: San Luis Obispo
Date(s) in Effect: 10/11/21 – 10/15/21, 7am-4pm
Description: Contractor will be performing site utility locating and investigation utilizing a hydro vac pump truck. Area of impact is noted on the associated map below. Please be advised noise is to be expected.