Construction Alerts Archive
SLO Campus Center Building 3300 AV Work
Location: (SLO) Building 3300
Date(s) in Effect: August 26th - September 13th, 2024
Description: The contractor will install new Audio-Visual equipment in rooms 3311 & 3312. Minor noise is expected. The area of impact is noted on the associated map.
SLO Campus Center Building 7300 VFD Replacement
Location: (SLO) Building 7300
Date(s) in Effect: August 5th – August 9th, 2024
Description: Contractor will be replacing twelve (12) variable frequency drives (VFD) in the 7300 building’s HVAC units. The contractor will be locally shutting down electrical to each VFD as it is replaced. No other electrical service throughout the building should be affected. Staging for the contractor and equipment will be in the gated area located to the north of building 7300. The area of impact is noted on the associated map.
SLO Campus Center Buildings 7300 3300 & 4400 Painting & AV CA
Location: (SLO) Buildings 3300 and 4400
Date(s) in Effect: August 5th, 2024 – August 9th, 2024
Description: Contractor will be performing touch-up painting and installing audio-visual equipment in the classrooms of the 3300 and 4400 buildings. The areas of impact are noted on the associated map.
North County Campus Building N3100/N3200 Air Balance Test
Location: (NCC) Building N3100/N3200
Date(s) in Effect: Friday; July 26th, 2024; 7am – 4pm
Description: Contractor will be conducting air balance testing of the building’s HVAC system. The contractor will be operating a scissor lift in the entry area of the Library and in Dallons Hall. The area of impact is noted on the associated map.
SLO Campus Center Hollister Road Sidewalk
Location: (SLO) Hollister Road Sidewalk
Date(s) in Effect: July 16, 2024 – August 9, 2024
Description: Contractor will be closing a portion of the Hollister Road sidewalk to repair a storm drain culvert. Pedestrian traffic will be temporarily rerouted through the access road parallel to the athletic fields. The area of work is noted on the associated map below.
SLO Campus Center Hollister Road Sidewalk
Location: SLO Campus Center Hollister Road Sidewalk
Date(s) in Effect: July 16, 2024 – July 26, 2024
Description: Contractor will be closing a portion of the Hollister Road sidewalk to repair a storm drain culvert. Pedestrian traffic will be temporarily rerouted through the access road parallel to the athletic fields. The area of work is noted on the associated map below.
SLO Campus Center Building 4000 Complex Conduit Boring
Location: (SLO) 4000 Complex Southeast Exterior
Date(s) in Effect: July 22, 2024 – July 26, 2024
Description: Contractor will be performing a directional bore for the new conduit between the 4000 complex electrical substation and switch 9 adjacent to Cougar Park.
SLO Campus Center Buildings 5200 HVAC Crane Pick
Location: (SLO) Building 5200
Date(s) in Effect: June 28th, 2024; 8am to 4pm
Description: Contractor will be utilizing a crane to install HVAC equipment on the roof of building 5200. The area of impact is noted on the associated map. Noise and traffic from construction vehicles are to be expected.
SLO Campus Center Power Outage
Location: (SLO) Campus-Wide Power Outage
Date(s) in Effect: Wednesday; June 19th, 2024; 6am to 6pm
Description: Contractor will be programming and testing the vacuum fault interrupter system at the 12kV main electrical switchgear equipment. To perform this work, the power to the entire campus will be shut off.
SLO Campus Center Fire Hydrant Relocation
Location: (SLO) Campus-Wide Water Service Interruption
Date(s) in Effect: Wednesday; June 19th, 2024; 6am to 6pm
Description: Contractor will be installing a new fire hydrant near the administration loop at the front of the campus. To perform this work, the water service to the entire campus will be shut off. The area of impact is noted on the associated map. Noise and traffic from construction vehicles are to be expected.