Construction Alerts Archive

 

Asphalt Slurry Seal Work on Parking Lot 5 Loop & ADA Parking

Location: San Luis Obispo

Date(s) in Effect: 08/06/20, 11am – 5pm

Description: The general contractor will be applying an asphalt slurry seal to Parking Lot 5 Loop & ADA Parking. Areas of work are noted on associated map. Equipment noise is to be expected.



Road Striping: Romauldo, Hollister, Chorro Valley and Cuesta College Roads

Location: San Luis Obispo

Date(s) in Effect: 08/10/20 to 08/11/20, 7am – 5pm

Description: The general contractor will be striping the asphalt slurry seal to Romauldo, Hollister, Chorro Valley and Cuesta College Roads. Areas of work are noted on associated map. Campus will remain accessible to vehicles with short traffic delays. Equipment noise is to be expected.



Parking Lot 5A Striping

Location: San Luis Obispo

Date(s) in Effect: 08/07/20, 7am – 5pm

Description: The general contractor will be striping the asphalt slurry seal to Parking Lot 5A. Areas of work are noted on associated map. Equipment noise is to be expected.



Road Striping: Romauldo, Hollister, Chorro Valley and Cuesta College Roads

Location: San Luis Obispo

Date(s) in Effect: 08/04/20 to 08/06/20, 7am – 5pm

Description: The general contractor will be striping the asphalt slurry seal to Romauldo, Hollister, Chorro Valley and Cuesta College Roads. Areas of work are noted on associated map. Campus will remain accessible to vehicles with short traffic delays. Equipment noise is to be expected.



Pulling IT cable from Building 1200 to the pool equipment enclosure

Location: San Luis Obispo

Date(s) in Effect: 08/03/20 to 08/07/20, 7am – 4pm

Description: The IT electrical contractor will be pulling cable from Building 1200 to the pool equipment enclosure. There may be minimal impacts around the area of work highlighted in the map below.



Asphalt Seal Coat in Parking Lot 5A

Location: San Luis Obispo

Date(s) in Effect: 07/31/20, 7am – 5pm

Description: The contractor will be applying an asphalt seal coat to Parking Lot 5A. Area of work is noted on associated map. Equipment noise is to be expected.



Asphalt Slurry Seal to Romauldo, Hollister, Chorro Valley, and Cuesta College Roads

Location: San Luis Obispo

Date(s) in Effect: 07/28/20 to 07/29/20, 7am – 5pm

Description: The general contractor will be applying an asphalt slurry seal to Romauldo, Hollister, Chorro Valley, and Cuesta College Roads. Areas of work are noted on associated map. Campus will remain accessible to vehicles with short traffic delays. Equipment noise is to be expected.



Asphalt Striping Parking Lot 5 & 6, 4000s Engineering/Tech Yard, and Service Road

Location: San Luis Obispo

Date(s) in Effect: 07/21/20 – 07/24/20, 7am – 5pm

Description: The contractor will be striping the new asphalt in parking lot 5 & 6, 4000s Engineering/Tech Yard, and Service Road. Areas of work are noted on the associated map. Equipment noise is to be expected.



Paving Asphalt—Parking Lot 6 and Service Road

Location: San Luis Obispo

Date(s) in Effect: 07/09/20 – 07/12/20, 7am – 5pm

Description: The contractor will be paving asphalt in parking lot 6, and service road. Areas of work are noted on associated map. The parking lot and service road will be closed. Equipment noise is to be expected.



Fire Alarm Testing—Buildings 1000, 1100, 1200, 1300, and 1400

Location: San Luis Obispo

Date(s) in Effect: 07/08/20, 7am – 3pm

Description: Fire alarm testing will be conducted at the new Aquatics Center Restroom on the pool deck Building 1600. This testing will alarm other buildings in the vicinity including Buildings 1000, 1100, 1200, 1300, and 1400. Please be advised alarms will be audible during this time.