Construction Alerts Archive

 

Roofing Work at Buildings 6100 & 7100

Location: San Luis Obispo

Date(s) in Effect: 5/23/22 - 8/30/22, 7am-4pm

Description: Contractor will be performing roofing work on Building 6100 and 7100. Please be advised HVAC systems in these buildings will be affected. A few parking spaces at the northeastern corner of Parking Lot 2 will be utilized for the contractor. Area of work is noted on associated map. Noise is to be expected.



UPDATED: Roof Work at Building 2500

Location: San Luis Obispo

Date(s) in Effect: 5/21/22 - 6/6/22, 7am-4pm

Description: Contractor will be replacing the roof on Building 2500. Please be advised pedestrian traffic around the perimeter of Building 2500 will be periodically impacted. Pedestrians will be routed around the work area using delineators and caution tape. Area of impact is noted on associated map. Noise is to be expected.



UPDATED: Roof Work at Building 6300

Location: San Luis Obispo

Date(s) in Effect: 5/20/22 - 6/1/22, 7am-4pm

Description: Contractor will be replacing tile roofing on Building 6300. Please be advised pedestrian traffic around the perimeter of Building 6300 and the front of Building 6200 will be periodically impacted. Pedestrians will be routed around the work area using delineators and caution tape. Area of impact is noted on associated map. Noise is to be expected.



Roof Work at Building 4000

Location: San Luis Obispo

Date(s) in Effect: 5/21/22 – 6/12/22, 6am-6pm.

Description: Contractor will be replacing half of the existing roof on Building 4000. A temporary stair set will be installed at the south-east corner of Building 4000. Laydown areas for materials, equipment and roll-off bins are indicated below. Please be advised Parking Lot 5A will periodically be impacted with construction equipment. Noise is to be expected.



Worksite Prep at Buildings 6100 & 7100

Location: San Luis Obispo

Date(s) in Effect: May 16, 2022 - May 20, 2022 – 7am-4pm

Description: Contractor will be setting fencing, stair towers, and trash containers for the upcoming roof and HVAC replacement projects at Buildings 6100 and 7100. Please be advised, pedestrian path of travel on the west side of Building 7100 and east sides of Buildings 6100 and 7100 will be impacted. Area of work is noted on associated map. Noise is to be expected.



Aquatic Center Site Improvements

Location: San Luis Obispo

Date(s) in Effect: 5/16/22 – 7/15/22, 7am - 4pm

Description: Contractor will be performing sitework improvements on the south side of the Aquatics Center. Please be advised intermittent electrical outages at the Aquatic Center may occur. Temporary fencing will be installed at the laydown areas indicated below. Area of work is noted on associated map. Noise is to be expected.



Landscaping Work at Building 5000 Courtyard Area

Location: San Luis Obispo

Date(s) in Effect: 5/16/22 – 5/25/22, 7am-4pm

Description: Contractor will be performing landscape work at Building 5000 Courtyard area. Please be advised the area between the modular Buildings will be blocked off and will not be accessible. Modulars will remain open and can be accessed from Parking Lot 2. Area of work is noted on associated map. Noise is to be expected.



Crane Work at Building 6300

Location: San Luis Obispo

Date(s) in Effect: 5/6, 5/9-5/10, 2022, 7am-4pm

Description: A crane will be utilized to set the rooftop HVAC unit above classroom 6301. Please be advised path of travel in front of Building 6300 and between Building 6200 and 6300 will be impacted on May 6, only, beginning at 11:00am. Area of work is noted on the associated map. Noise is to be expected.



UPDATED: Hydration Station Installations at Tennis Court

Location: San Luis Obispo

Date(s) in Effect: 4/6/22 – 5/6/22, 7am-4pm

Description: Contractor will replace two drinking fountains with new hydration stations. Please be advised three to four parking spaces nearest to the fountain being replaced will be designated for construction vehicles. Area of work is noted on associated map. Pedestrian traffic will not be obstructed. Noise is to be expected.



UPDATED: Renovation Work at Building 4000

Location: San Luis Obispo

Date(s) in Effect: 3/21/22 – 5/5/22, 7am-4pm

Description: Contractor will be renovating the restrooms, replacing the drinking fountains, and upgrading the fire alarm system. Parking spaces to the east of Building 4000 will be designated for a roll off bin & construction vehicles. Area of work is noted on associated map. Please be advised restrooms will be out of service for the duration of impact. Pedestrian pathways will not be affected. Noise is to be expected. See laydown plan below for further detail.