Construction Alerts Archive
SLO Campus Center Cougar Park – Utility Locating
Location: SLO Campus Center Cougar Park - Utility Locating
Date(s) in Effect: January 30th, 2026 – February 1st, 2026
Description: Contractor will be performing utility line site locating daily between 7:00 am and 4:00 pm. Noise from machinery is expected. The area of impact is noted on the associated map below.
SLO Campus Center Gas Valve Repair
Location: SLO Campus Center - Gas Valve Repair
Date(s) in Effect: January 14th, 2026; 7am to 4pm
Description: The contractor will be repairing a gas line near building 2400. This work will cause a brief interruption of gas services impacting the 2000, 4000, and 1000 complexes, as well as the 3300-3400 building. Minor noise is expected. The impacted areas are noted on the associated map.
SLO Campus Center Asphalt Slurry Seal
Location: SLO Campus Center
Date(s) in Effect: January 14th, 2026 – January 15th, 2026
Description: The contractor will apply a slurry seal to portions of the service road and Hollister Road. During construction, one lane on Hollister Road will remain open, with traffic directed by a traffic control crew. The service road north of the swing arm gate will be closed for up to 24 hours, during which time the loading dock and the parking lot behind the bookstore will be inaccessible. Lots 2 and 2A will remain open and accessible from Romauldo Road. Strong odors are expected during slurry application. Affected areas are shown on the associated map.
SLO Campus Center Fire Alarm Testing
Location: SLO Campus Center Fire Alarm Testing
Date(s) in Effect: Friday, January 9th, 2026; 8:30 am – 10:30 am
Description: The fire alarm system test will impact the new Campus Center, 6600 A, B, C, D, 2600, 2700, and 3100 buildings. During testing, audio and visual fire alarm devices may be initiated. The area of impact is noted on the associated map.
SLO Campus Center 1400 Wireless Access Point Replacement
Location: SLO Campus Center 1400 - Wireless Access Point Replacement
Date(s) in Effect: January 8th, 2026, 11:10 am to 3:45 pm
Description: The contractor will replace existing wireless access points (APs) in Stork Gymnasium. This work is expected to cause minimal disruption to scheduled events and building operations, generate minimal noise, and should not affect network connectivity or services.The area of impact is noted on the associated map.
SLO Campus Center 3100 Wall Coring (Extended)
Location: SLO Campus Center 3100
Date(s) in Effect: December 22nd, 2025 – December 23rd, 2025
Description: The contractor will mobilize to drill through exterior masonry walls for sleeves near 3180. Loud drilling noise is expected. This activity has been extended to 12/23/2025. The area of impact is noted on the associated map.
SLO Campus Center Asphalt Repair Project
Location: SLO Campus Center
Date(s) in Effect: December 22nd, 2025 - January 16th, 2025
Description: The contractor will grind and overlay the existing asphalt roads around the perimeter of the San Luis Obispo Campus, as well as slurry seal select locations around campus. One lane will remain open during construction, and traffic will flow in one direction around campus. Please plan for traffic delays throughout the construction window. The areas of impact are noted on the associated map.
Wireless Access Point Replacement
Location: District-Wide
Date(s) in Effect: December 15, 2025 – January 20th, 2025
Description: The contractor will be on both campuses to replace existing wireless access points (APs) in various buildings. This work will not disrupt classes or campus operations, is expected to generate minimal noise, and should not affect network connectivity or services.
SLO Campus Center 7300 Fire Alarm Test
Location: SLO Campus Center 7300 Fire Alarm Test
Date(s) in Effect: December 18th, 2025
Description: The fire alarm system will be tested between the hours of 6:00 am and 8:00 am. During testing, audio and visual fire alarm devices may be initiated. The area of impact is noted on the associated map.
North County Campus Power Outage
Location: NCC N1000, N1100, N2400, N2800, N4000, N5300 Electrical Shut Off
Date(s) in Effect: December 29th, 2025 – December 31st, 2025
Description: Electrical power for buildings N1000, N1100, N2400, N2800, N4000, and N5300 will be shut off daily from 7:00 am to 4:00 pm. The impacted areas are noted on the associated map.